Position the shingles with a.
How to shingle a roof with cedar shakes.
The position of the first batten should be the batten gauge plus half the thickness of the batten.
Installing cedar roofing shingles yourself can be done when you prepare for all the steps ahead of time.
Cover all of the nail heads with roofing cement.
A cedar shake is much thicker than a cedar shingle.
The gaps between the sheathing allow for proper ventilation which prevents the cedar shingles from warping and cupping.
Make sure to get the entire surface of your cedar shingle roof.
A good rule of thumb is getting 10 percent more than you need just in case you need more material.
Secure it to the roof by driving in two nails near the top edge of the shingle about 1 inch below its top edge.
Apply it with a pump sprayerlet it sit for about 15 minutes before rinsing it off with with a garden hose.
Pay special attention to areas where there might still be moss or lichen remnants.
This method imprinted the imperfections into the style which we have come to love as time has gone on.
Be sure to keep the hose pointed downward to avoid forcing water up behind the shingles.
The cedar bureau recommends using a solution of 1 part bleach to 3 parts water.
Use a garden sprayer or similar device to spray the mixture on your cedar shingles.
Cedar breather creates a space between the cedar shingles and the roof.
Measure out the square footage of the roof to make sure you have enough wood.
Thisoldhouse asktoh subscribe to this old house.
The batten gauge thereafter is based on the pitch of the roof.
Vapour permeable underlay needs to be counter battened to allow ventilation of the batten space above underlay and below cedar shingles.
Allow the bleach or citric mixture to sit for about 15 minutes.
Cover the length of the cedar shingle roof peak that the new layers of shingles have made.
Traditionally cedar shakes were made by splitting the wood with a froe and mallet.
Tom silva shows the apprentices how to properly install wood shingles.
Step 3 put the next shingle about one eighth to one quarter of an inch away from the edge of the first shingle.
Another option is to use plywood sheathing in conjunction with a cedar breather no products found.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
This rough cut surface results from the method of production.