Be sure to include doorways and floor obstructions such as cabinets and fixtures as well as any tile edging or.
How to put up a wall on concrete floor.
Concrete may be tough as rock but with the right tools securing walls to slabs is a smooth process.
Shoot masonry screws into the strips every 6 8 on center to fasten them to the concrete.
Use tin snips to cut the strips as necessary.
Make sure the braces are level and lay down a barrier of wire mesh over the existing concrete inside of the barrier.
Subtract 3 1 4 inches to find the stud length needed.
Other nails have a thick shank that sometimes has spiral ridges for improved holding power.
Try to put it slightly off center from your chalk line closer to the wall.
Layout lines must be square otherwise you will end up with odd shaped tiles at the walls.
Some concrete nails are the cut nail design shown in the photo with a thick flat shank and a tapering v profile.
Place tackless strips around the entire perimeter of the room.
In this video i show you the method that i use to attach basement framing to a concrete floor.
Then pick up the board and place it back down but this time right up against the chalk line.
The strips should be installed 1 2 from the wall with the tacks facing the wall.
Measure from the floor to the ceiling in at least three spots in the wall location.
The best way to ensure square lines is to make a floor plan by drawing the walls of the room as accurately as possible on a sheet of grid paper.
Concrete is poured and left to cure for a minimum of three days.
Sand blinding will take place if necessary.
With simple materials and readily available tools the novice carpenter can lay out build and anchor walls on concrete slabs.
Underfloor heating pipes are put in place if necessary.
A damp proof membrane is put down.
I use tapcon concrete screws to secure the wood to the floor.
Choose a length that will penetrate the concrete at least 1 inch.
Once you ve got the adhesive in a neat little line on the floor it s time to mess it up a bit.
Then build a perimeter or a wood brace that is the same height as you want the concrete to be.
Hardcore or a type 1 floor seal is compacted using a whacker plate.
Be sure to wear safety goggles when hammering masonry nails into concrete.
Take the first board and place it on the floor on top of the adhesive.
First time remodelers often make the mistake of letting drywall rest on the floor while attaching it to the vertical wall studs with screws rather than pushing the board up as high as possible to.